Laser Weapon Systems · Vehicle-mounted lasers
DE M-SHORAD (Guardian)
Also known as Directed Energy Maneuver-Short Range Air Defense; Guardian; 50 kW laser Stryker
The U.S. Army's 50 kW-class laser on the Stryker A1; four prototypes were sent to the Middle East in 2024, where soldiers reported heat and integration problems.
- Laser power
- about 50 kW

Sourced record, not yet reviewed. Compiled from the public sources listed below. Every figure is attributed to its source; where sources disagree, both values are shown. No editor has reviewed this record yet.
Overview
DE M-SHORAD puts a 50 kW-class high-energy laser, a beam director, sensors and a radar on a Stryker A1 8x8. The Army bought a platoon of four prototypes to protect manoeuvring units against drones, aircraft, rockets, artillery and mortars (government).
Kord Technologies led the prototype effort, with Raytheon supplying the laser module, beam director and radar (specialist press). The four prototypes went to the U.S. Central Command area in 2024; the Army's acquisition chief said fitting the laser into a vehicle that moves constantly was proving difficult (specialist press).
Technical profile
Seeker, guidance, warhead, data link and launcher as described in public sources. Each line cites its source.
| Laser type | 50 kW-class high-energy laser supplied by Raytheon | Official document[2][7] |
|---|---|---|
| Beam director | Raytheon beam director | Secondary reference[7] |
| Sensors | Raytheon EO/IR target acquisition and tracking system plus Ku720 multi-mission radar | Secondary reference[7] |
| Power supply | Power management by prime contractor Kord; the power and thermal system came from Rocky Research (Honeywell) | Secondary reference[7][8] |
| Thermal management | Kord-supplied cooling; heat dissipation was a problem reported by soldiers in the CENTCOM area | Secondary reference[3][7] |
| Mobility | Stryker A1 8x8; a platoon of four vehicles | Official document[5][7] |
Publicly documented characteristics
Each figure shows where it comes from. “Not publicly disclosed” means no source we hold gives a figure; it is never treated as zero.
| Characteristic | Value | Evidence and sources |
|---|---|---|
| Output power class (kW) | ≈ 50 kW"50 kW-class"; a class, not a measured output. | Official document[1][2] |
| Launch / operating platform | Stryker A1 8x8; platoon of four prototypes | Official document[1] |
| Maximum range (km) | Not publicly disclosedNot published. |
Platforms and integration
Launchers, vehicles, ships, aircraft, sensors and command systems the record is integrated with, by status.
Operators
Contracts and orders
Publicly announced contracts, newest first. Values and quantities are as reported; currencies are not converted.
| Date | Customer · contract | Quantity | Value | Sources |
|---|---|---|---|---|
| U.S. Army Rapid Capabilities and Critical Technologies Office · Kord TechnologiesOther Transaction Authority award for 50 kW-class Stryker laser prototypes, with Northrop Grumman and Raytheon building competing lasers. | 4 prototypes | US$203 million (potential US$490 million) | [5] |
Production and deliveries
Reported production, delivery and order figures by period. Gaps mean no public figure, not zero.
| Period | Figure | Quantity | Sources |
|---|---|---|---|
| 2023 | Delivered | 4 prototypesDelivered to the 4th Battalion, 60th ADA Regiment at Fort Sill. | [9] |
Development and tests
2024 · Test
Evaluated in the Middle East
The four prototypes went to the CENTCOM area; the Army's acquisition chief told lawmakers integration on a constantly moving vehicle was proving difficult. [3]
2023-09 · First delivery
Prototype platoon delivered
RCCTO delivered four prototypes to the Army's first directed-energy capable unit at Fort Sill. [9]
2023-03 · Test
Live-fire demonstration at Yuma
Crews and the prototype team ran a capability demonstration during a live-fire exercise at Yuma Proving Ground. [9]
2022-10 · Development
Transition pushed back
RCCTO projected a programme of record in FY2024, later than first planned, to mature manufacturing and the supply base. [8]
2021-07 · Test
Combat Shoot-Off at Fort Sill
The Raytheon-equipped prototype met the programme's design and performance criteria; Northrop Grumman had withdrawn after fire and smoke damage in a January 2021 checkout. [6][8]
2019-07-26 · Development
Prototype agreement awarded
Kord Technologies received the OTA to integrate lasers on four Strykers. [5]
Capabilities and limitations
Stated capabilities
- 50 kW-class laser on a protected 8x8 vehicle (government).
- Planned target set includes drones, helicopters, fixed-wing aircraft, rockets, artillery and mortars (government).
Limitations and open questions
- Heat management and on-board electronics caused problems in the field (specialist press).
- Soldier feedback from the Middle East deployment was described as disappointing (specialist press).
Relevance to threats
Listed by the strength of the evidence. Inclusion here is not a claim of proven effectiveness.
- One-way attack UAVsOfficial document
Unmanned aircraft are in the Army's stated target set.
- Rockets, artillery and mortarsOfficial document
Rockets, artillery and mortars are in the stated target set; no published intercepts.
Sources
- 1.
Army to field laser-equipped Stryker prototypes in FY 2022 (opens in a new tab)
DSIAC (U.S. DoD), reprinting a U.S. Army article · Government · Published · Retrieved
Supports: 50 kW-class laser; platoon of four Stryker prototypes; target set of UAS, rotary- and fixed-wing aircraft, rockets, artillery and mortars
- 2.
Stryker Directed Energy Maneuver-Short Range Air Defense (DE M-SHORAD) (opens in a new tab)
DVIDS (Army Rapid Capabilities and Critical Technologies Office) · Government · Published · Retrieved
Supports: Official description: 50 kW-class high-energy laser on the Stryker A1 8x8
- 3.
Defense Daily · Specialist press · Published · Retrieved
Supports: Four prototypes sent to the CENTCOM area; heat management and integration on a moving vehicle cited as challenges by Army acquisition chief Doug Bush
- 4.
US Army launches laser production with $465M contract award (opens in a new tab)
Defense News · Specialist press · Published · Retrieved
Supports: $464.8 million E-HEL production agreement for 30 kW LOCUST X3; Group 1–3 UAS; JLTV host; disappointing feedback on DE M-SHORAD in the Middle East
- 5.
Army awards laser weapon system contract (opens in a new tab)
U.S. Army (army.mil) · Government · Published · Retrieved
Supports: OTA award to Kord Technologies on 26 July 2019, $203 million with potential to $490 million, for four 50 kW-class Stryker prototypes; Northrop Grumman and Raytheon competing laser subcontractors; GDLS integration support; fielding to a platoon planned in FY2022
- 6.
Army advances first laser weapon through Combat Shoot-Off (opens in a new tab)
U.S. Army (army.mil) · Government · Published · Retrieved
Supports: Combat Shoot-Off at Fort Sill ended in late July 2021; system met design and performance criteria; platoon of four Strykers planned for FY2022
- 7.
Army Selects Kord and Raytheon for Stryker Laser Weapon Contract (opens in a new tab)
AFCEA SIGNAL · Specialist press · Published · Retrieved
Supports: $123.9 million for three more 50 kW systems on Stryker A1; Kord as prime and integrator supplying power management and cooling; Raytheon supplying the laser, beam director, EO/IR acquisition and tracking system and Ku720 radar
- 8.
SHORAD laser weapon will stay in development phase longer than planned (opens in a new tab)
Defense News · Specialist press · Published · Retrieved
Supports: Northrop Grumman withdrew in early 2021 after power and thermal management problems caused fire and smoke damage; Rocky Research (Honeywell) supplied the power and thermal system; programme of record projected for FY2024; first Strykers to Fort Sill by end of 2022
- 9.
U.S. Army (army.mil) · Government · Published · Retrieved
Supports: Four DE M-SHORAD prototypes delivered to 4th Battalion, 60th ADA Regiment at Fort Sill; crews trained on surrogate vehicles and virtual trainers; live-fire capability demonstration at Yuma Proving Ground in March 2023; soldier touchpoint planned for FY24
This record is compiled and kept up to date by World of Interceptors at www.worldofinterceptors.com/systems/de-m-shorad. Cite it with a link to this page. Compiled from open sources and cross-checked, but accuracy cannot be guaranteed; manufacturers and independent organisations can ask us to correct or remove information (disclaimer).
Related systems

© RTX (Raytheon)
Revision history
· Created
Record compiled from public sources found through treg web search.
· Update
Added profile, integrations, operator, contracts, production and milestones from U.S. Army releases and specialist press.
Newsletter · every two weeks
The Interceptors Brief
What changed in air defence and counter-drone, in five minutes, with the sources attached.
Confirm by email · unsubscribe in one click · Privacy