Every figure links to the source that supports it. When we get something wrong, we correct it in the open.
How we cite
Sources are attached to individual figures and claims, not just to the page. Each source records its publisher, publication date, the date we retrieved it and the claim it supports.
Reporting an error
Send corrections through the contact page. Please include the record, the figure or statement, and a source. Corrections are reviewed by an editor and recorded in the record’s revision history.
Images
We use public-domain and openly licensed photographs (U.S. government, UK Open Government Licence, Creative Commons) with their credit and licence, and manufacturer press photographs credited to the manufacturer. We do not use news-agency photography without a licence. If you hold the rights to an image here and object to its use, write to us through the contact page: we remove it, normally within two working days, and note the removal in the record’s history.
Corrections log
Demonstration entries drawn from prototype records.
Contracts audit: the 2024 NSPA order for 940 FIM-92K now cites the Federal Register text of the December 2023 sale notification (transmittal 23-77); its US$780 million is labelled as the notification's estimated total cost, not a signed contract value.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: July 2026 additional serial production line dated 9 July 2026 and its value set to the EUR 1.470.500.012,38 in ASELSAN's KAP disclosure (was 'about EUR 1.47 billion', July 2026); the disclosure does not name HİSAR, which rests on press.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: July 2026 additional serial production line dated 9 July 2026 and its value set to the EUR 1.470.500.012,38 in ASELSAN's KAP disclosure (was 'about EUR 1.47 billion', July 2026); the disclosure does not name HİSAR, which rests on press.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: Saudi Phalanx sale notification dated 10 February 2016 (was February 2016) from the Federal Register text of transmittal 15-82, with five upgrade kits added as the quantity.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the 2023 U.S. government order now cites DroneShield's own release, dated 15 July 2023 (was 20 July 2023, the date of a press report). The release gives '$33 million' without a currency (was 'US$33 million') and does not name DroneGun Tactical; it covers equipment and multi-year services.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the Romanian line, reported in July 2025 as a planned purchase of about €626 million for 200 systems and over 1,000 missiles, is replaced by the contract signed on 25 November 2025 (Romanian MoD: €625,591,000 excluding VAT, 231 systems, 934 missiles). The SIMBAD RC order is dated December 2024, when the French ministry says the DGA placed it (announced 28 January 2025).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: Czech MSHORAD order corrected from '€170 million' (reference work) to Saab's SEK 1.8 billion, dated 23 July 2025; Lithuanian (9 July 2024, about SEK 1.3 billion) and Swedish (17 January 2024, about SEK 300 million) orders given Saab's dates and values.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the Indian LBRM agreement is dated 10 February 2025 as in the Thales release (previously 11 February, the publication date).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Lightweight Multirole Missile (Martlet)
Contracts audit: the Ukrainian £162 million order dated 6 September 2024 from GOV.UK; the Indian line now shows only the official £350 million (the dollar conversion was removed).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: added Diehl Defence's own releases to the 2023 German and Baltic lines; the Baltic line is a framework agreement according to Diehl.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: Australia line corrected from 'March 2017, A$2.5 billion, 6 fire units' (reference work) to the official 10 April 2017 government approval of up to A$2 billion for development, which is not a production contract; Hungary dated 30 November 2020 from Kongsberg; Taiwan line matched to DSCA Transmittal 24-48.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the French VL MICA order is dated December 2024, when the ministry says the DGA placed it (announced 28 January 2025).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the August 2026 framework line now follows the Ministry of National Defence: PLN 8 billion (the euro conversion was removed) and several thousand Piorun sets; the press split into launchers and missiles is not in the official text.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: the 2019 UAE line is now the DSCA notification (transmittal 19-37, Federal Register): notified to Congress on 3 May 2019 as a possible sale of up to 452 PAC-3 MSE estimated at $2.728 billion; it was described as a purchase dated only to 2019.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Spain's Patriot contract: the War Department announced it on 22 December 2025 (awarded 19 December) as a $841,682,106 award bringing the contract to $1,721,373,872; date and value changed from 30 December 2025 and the rounded $1.7 billion, which RTX's release gave.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: Germany's order for two replacement Patriot fire units now cites the BAAINBw release, dated 2 November 2026; the date changed from 3 November (press).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.June 2026 THAAD production contract: value changed from "up to US$35 billion" to the announced US$35,327,237,604, with the War Department release added as a source.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: the 2017 Saudi line is now the DSCA notification of 6 October 2017 (transmittal 17-28), a possible sale estimated at $15 billion of 44 launchers, 360 interceptors, 16 fire control and communications station groups and 7 AN/TPY-2 radars; the earlier "7 fire units" was not in the notice. The 2012 launcher contract and the 2011 UAE contract now cite Lockheed Martin's releases (15 August 2012; 30 December 2011, US$1.96 billion for two THAAD systems).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: Germany's initial Arrow 3 contract is dated 23 November 2023 with the value the German defence ministry gives (€3.6 billion), replacing the press figure of about US$3.5 billion and the June 2023 date; the December 2025 expansion now cites IAI's release and is dated 17 December 2025.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: Boeing's releases added for the 2003 agreement and the 2004 contract; the 2004 contract is dated 1 April 2004 (Boeing's announcement) instead of March 2004, and the customer is named Israel Aircraft Industries, as in the releases.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: Finland's David's Sling decision now cites the Finnish Ministry of Defence release of 5 April 2023 and gives its value, about €316 million excluding VAT.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: Denmark's September 2025 line now cites the Danish Ministry of Defence; it was a decision to procure SAMP/T as the long-range system, not an order, so the line no longer calls it an order.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.SM-3 Block IIA production contract: date changed from 10 August (RTX release) to 7 August 2026 (War Department announcement) and value from "US$745 million" to the announced base value of US$745,387,095; description now says it covers U.S. and Japanese (FMS) missiles.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the two Army Coyote awards now cite the War Department contract announcements. September 2025 award dated 29 September 2025 with the official value US$5,039,629,681 and contract number W31P4Q-25-D-0013 (was 'about US$5 billion', September 2025); September 2024 award value corrected to the announced US$196,719,957 (was US$197 million) with contract number W31P4Q-24-C-0018.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Kuwait counter-UAS sale notification: date made exact (5 June 2026, the date the notification was delivered to Congress; was given only as June 2026) and the Federal Register text added as the official source. Contracts audit: Marine Corps installation C-sUAS award dated 7 March 2025 with the official maximum value US$642,210,000 and contract number M67854-25-D-0003 (was US$642 million, March 2025); October 2024 DoD order value corrected to US$249,978,466 from Anduril's release (was 'about US$250 million').
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Kuwait counter-UAS sale notification: date made exact (5 June 2026, the date the notification was delivered to Congress; was given only as June 2026) and the Federal Register text added as the official source. Contracts audit: Marine Corps installation C-sUAS award dated 7 March 2025 with the official maximum value US$642,210,000 and contract number M67854-25-D-0003; MADIS CES award dated 19 November 2024, the date of Anduril's announcement (was 20 November 2024, the date of press reports).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: Romania's Skynex order is dated 29 May 2026 (signature, was June 2026) with the Romanian MoD's figure of EUR 981,950,000 excl. VAT for the Rheinmetall Italia contract (7 Skynex, 2 Skyranger 35, 2 Millennium) instead of only the EUR 5.7 billion package total; the 2022 and 2019 orders now carry the days of Rheinmetall's releases (9 December 2022, 30 October 2019).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: Denmark's Skyranger 30 order is dated 30 September 2024 per Rheinmetall's release (was 2 October 2024, the date of a press report); Hungary's development contract was signed on 15 December 2023 and is worth close to €30 million.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the Global Military Products award is US$118,375,740 (contract W15QKN-23-C-0012, was the rounded US$118.3 million); the official announcement cites Fiscal 2010 FMS funds and names neither Ukraine nor Amman, which come from press reports. The 300,000-round Gepard ammunition order is dated 15 February 2023 and valued in the low three-digit million euro range.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the joint Tridon Mk2 purchase for Ukraine is dated 3 February 2026 and Denmark's share is SEK 480 million as stated by the Swedish government (was given as about SEK 480 million).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the 2020 M-LIDS contract is US$189,828,895 (W31P4Q-20-D-0031, awarded to DRS Sustainment Systems Inc. and announced 20 July 2020; was US$189 million, July 2020); the 2017 production contract is dated 10 October 2017.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: the World Cup contracts were announced on 7 April 2026 and are valued 'in the millions of dollars' (was 'several million dollars'); the 2024 European deals were announced on 29 May 2024, cover bases 'throughout Europe' for unnamed customers (was a single undisclosed European country) and are described as multimillion-dollar.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: Romania's contracts were signed on 29 May 2026 (was June 2026); the Romanian MoD gives EUR 981,950,000 excl. VAT for the Rheinmetall Italia contract and lists 2 Skyranger 35 systems, while Rheinmetall's release gives 24, so both figures are shown. The Ukrainian Leopard 1 Skyranger 35 order is dated 10 October 2025.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.GM200 MM/C contracts: Sweden's agreement was signed on 3 April 2025 (Thales; the 4 April date was FMV's announcement reported by the press); Lithuania's agreement is dated 3 January 2024 and worth EUR 126.7 million (Lithuanian MoD; was 'about EUR 127 million', 2024-01); Norway's follow-on was signed on 23 November 2022 with a cost frame of NOK 460 million excluding VAT (Forsvarsmateriell; was 2022-11, no value).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.IRIS order of 2024 for Ukraine: dated 21 August 2024 (signing date in Robin Radar's release; was given as 2024 only).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Bundeswehr TRML-4D order: dated 12 July 2023, the date of HENSOLDT's release (was July 2023).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.NSPA framework selection: dated 23 September 2026, the date of Axon's announcement (was September 2026).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.LTAMDS awards of 2026: the January modification is US$1,025,100,000 (was the rounded US$1.02 billion); the LRIP modification was announced on 16 April 2026 (date was given only as April) for US$904,600,000. Poland's letter of acceptance for 12 radars was signed in October 2023 according to RTX (was September 2023 from a press report).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.XENTA-M contracts: the Thales order is dated 25 January 2022 and the PIT-RADWAR SAN contract 27 October 2026, the dates of Weibel's releases (were January 2022 and October 2026).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contract dates corrected to the L3Harris announcements: the Airbus Helicopters Canada H125 order to 4 June 2025 (was June 2025) and the SOCOM IDIQ to 18 August 2021 (was 24 August 2021, the date of a press report).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.SOCOM IDIQ date corrected to 18 August 2021, the day L3Harris announced it (was 24 August 2021, the date of a press report).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Canadian P-8A contract dated 26 May 2025, the date of L3Harris's release (was 27 May 2025, the date of a press report); the 2017 U.S. Navy P-8A award is dated 3 January 2017, when L3 WESCAM announced it (was January 2017).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.QinetiQ GmbH order dated 9 March 2022, the date of HENSOLDT's release (was 10 March 2022, the date of a press report).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: the October 2024 Roadrunner and Pulsar contract now cites Anduril's release of 8 October 2024 and its exact value, $249,978,466 (press: $250 million), with more than 500 Roadrunner-Ms. The September 2026 Pulsar-L award still rests on press; the Marine Corps notice on SAM.gov could not be retrieved.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Official-source audit: the March 2026 JIATF-401 order now cites the War Department story of 24 March 2026: the buyer was JIATF-401 for U.S. Northern Command and U.S. Strategic Command (press had "for the U.S. Air Force"), and the $6.1 million also covers one AeroVironment Titan Cerberus XL. The other SMASH orders still rest on press; no government or company release was found.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.MADIS (Marine Air Defense Integrated System)
Official-source audit: the MADIS RS6 production contract now cites Kongsberg's release, dated 1 October 2021 (was 5 October, press), awarded to Kongsberg Protech Systems USA with a potential value of $94 million; the release also confirms the September 2020 test-article award.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: Diehl's release on the German IRIS-T, SLS and SLM missile contracts is dated 5 February 2026, not 7 February as previously stated; Diehl's own release added as the source.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: Greek and Romanian lines now cite the Israel MOD and Romanian MApN releases. Romanian framework dated 18 July 2025 (was July 2025); both Romanian values are given as officially stated, excluding VAT (10.33 billion lei, about €2.038 billion; 3.049 billion lei). Greek package value given as the IMOD's 'approximately €3 billion'. The MApN releases do not name SPYDER; that link rests on press.
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.Contracts audit: L-SAM contract dates made exact from Hanwha releases and filings. Interceptor and launcher production signed 27 November 2025 (was December 2025, the month of a press report); multifunction radar production 2 October 2025 at 357,275 million won (was October 2025, 357.3 billion won); L-SAM II interceptor award announced 10 June 2025; L-SAM-II radar prototype award 26 May 2025 (was 2025).
Sourced · not yet reviewed — Sourced record: compiled from the public sources listed on the page. Figures are attributed, but no editor has reviewed the record yet.