Interceptor Missiles · Short-range air-defense missiles
CAMM (Sky Sabre / Land Ceptor / Sea Ceptor)
Also known as Common Anti-air Modular Missile; Land Ceptor; Sky Sabre; Sea Ceptor
MBDA UK's soft-vertical-launch, active-radar-homing air-defense missile, used on land as Land Ceptor within Sky Sabre and at sea as Sea Ceptor.
- Range
- at least 25 km
- Speed
- Mach 3

Sourced record, not yet reviewed. Compiled from the public sources listed below. Every figure is attributed to its source; where sources disagree, both values are shown. No editor has reviewed this record yet.
Overview
CAMM is a 99 kg missile developed by MBDA UK. It is pushed out of its canister by a gas generator before its rocket motor ignites (soft vertical launch), which gives 360° coverage and a small launch signature.
On land the British Army uses it as Land Ceptor within the Sky Sabre system, with a Saab Giraffe radar and Rafael command system. UK Defence Equipment & Support says it has three times the range of the Rapier it replaced and can engage up to eight threats at once. At sea it equips Royal Navy frigates as Sea Ceptor.
More images (1)

Technical profile
Seeker, guidance, warhead, data link and launcher as described in public sources. Each line cites its source.
| Seeker | Active RF seeker with a GaN solid-state amplifier | Secondary reference[3] |
|---|---|---|
| Guidance | Inertial with mid-course updates; active radar terminal homing | Secondary reference[3] |
| Warhead | 10 kg high-explosive blast-fragmentation | Secondary reference[3] |
| Fuze | Laser proximity and impact | Secondary reference[3] |
| Motor / propulsion | Solid motor shared with ASRAAM (CAMM); new Avio motor on CAMM-ER | Secondary reference[3] |
| Data link | Two-way data link; on land it is provided through the iLauncher | Secondary reference[3] |
| Launcher | Soft vertical launch by gas generator; iLauncher carries up to 8 CAMM or CAMM-ER on an 8×8 truck; naval cells and ExLS/Mk 41 options | Secondary reference[1][3] |
| Rounds per launcher | Up to 8 per iLauncher | Secondary reference[3] |
| Fire control / radar | Sky Sabre: Saab Giraffe AMB C-band radar and Rafael command system; Narew: Polish radars and US IBCS | Official document[2][3][4] |
| Reaction / readiness | Land Ceptor ready in under 20 minutes; MoD says Sky Sabre can control 24 missiles simultaneously | Official document[2][5] |
Publicly documented characteristics
Each figure shows where it comes from. “Not publicly disclosed” means no source we hold gives a figure; it is never treated as zero.
| Characteristic | Value | Evidence and sources |
|---|---|---|
| Maximum range (km) | At least 25 kmBasis: Range reported in secondary sourcesGovernment source says three times Rapier's range without a figure. | Secondary reference[3] |
| Maximum altitude (km) | 10 km | Secondary reference[3] |
| Speed (m/s) | Mach 3 | Secondary reference[3] |
| Mass (kg) | 99 kg | Manufacturer claim[1] |
| Length (m) | 3.2 m | Manufacturer claim[1] |
| Diameter (mm) | 166 mm | Manufacturer claim[1] |
| Guidance / cueing | Inertial with mid-course update; active radar terminal homing | Secondary reference[3] |
| Effect | HE blast-fragmentation; laser proximity and impact fuze | Secondary reference[3] |
| Launch / operating platform | Sky Sabre launcher truck; ship canisters (Sea Ceptor) | Official document[2][1] |
| Payload / warhead (kg) | 10 kgHE blast-fragmentation warhead, common to the family. | Secondary reference[3] |
Platforms and integration
Launchers, vehicles, ships, aircraft, sensors and command systems the record is integrated with, by status.
| Platform or system | Domain | Status | Sources |
|---|---|---|---|
| Sky Sabre (iLauncher, Giraffe AMB, Rafael C2) · United KingdomIn service since January 2022; six more launchers ordered 2025. | Land | In service | [3][5] |
| Narew (CAMM-ER, iLauncher on Jelcz, IBCS) · Poland | Land | Ordered | [3][4] |
| Pilica+ (CAMM with PSR-A Pilica) · PolandDeliveries began September 2025. | Land | In service | [3] |
| CAMM-ER in Grifo, MAADS and Albatros-NG · ItalyArmy, Air Force and Navy. | Land | Ordered | [3] |
| Sea Ceptor on Type 23 frigates · United KingdomIn service since May 2018. | Naval | In service | [3] |
| Type 26 and Type 31 frigates · United Kingdom | Naval | Ordered | [3] |
| Anzac-class frigates (20-cell) · New Zealand | Naval | In service | [3] |
| Tamandaré-class frigates (12-cell) · Brazil | Naval | Ordered | [3] |
| Visby-class corvettes · Sweden | Naval | Ordered | [3] |
Operators
Contracts and orders
Publicly announced contracts, newest first. Values and quantities are as reported; currencies are not converted.
| Date | Customer · contract | Quantity | Value | Sources |
|---|---|---|---|---|
| United Kingdom (MoD) · MBDASix Land Ceptor launchers for Sky Sabre, three-year contract, doubling deployable Sky Sabre systems | 6 launchers | £118 million | [5] | |
| Sweden (FMV) · SaabInstallation and integration of the Sea Ceptor air defence system (CAMM) on the Swedish Navy's Visby-class corvettes; FMV ordered the Sea Ceptor equipment from MBDA earlier. | — | about SEK 1.6 billion | [9] | |
| Poland (PGZ) · MBDA UKNarew sub-contract with technology transfer for Polish production of CAMM-ER and iLaunchers | more than 1,000 CAMM-ER; over 100 iLaunchers | over £4 billion | [4] | |
| Poland · MBDAPilica+ first stage: CAMM missiles and launchers, delivery 2025–2029 | — | £1.9 billion | [3][4][7] | |
| United Kingdom (MoD) · MBDA (UK)FLAADS (Maritime) / Sea Ceptor demonstration contract, expected to last five years | — | £483 million | [3][8] |
Production and deliveries
Reported production, delivery and order figures by period. Gaps mean no public figure, not zero.
| Period | Figure | Quantity | Sources |
|---|---|---|---|
| 2022–2026 | Planned rate | monthly CAMM-family output to tripleAnnounced 13 March 2024 with doubled Bolton capacity and a second CAMM-ER final assembly line in Italy (reference work). | [3] |
Development and tests
2024-03-09 · Reported combat use
First combat use
HMS Richmond destroys two Houthi drones with Sea Ceptor (reference work). [3]
2023-09 · Development
CAMM-MR launched
MBDA and PGZ letter of intent for a medium-range, low-cost interceptor based on CAMM for Polish land systems and Miecznik frigates; UK–Poland agreements in July 2023. [3][6]
2022-01 · First delivery
Sky Sabre in British Army service
2021-06-24 · Test
CAMM-ER first live firing announced
Firing carried out in Italy in late 2020; CAMM-ER is 4.2 m long, 190 mm in diameter, with a new Avio motor. [3]
2018-05 · Test
First Land Ceptor system firing
Full-system firing by the British Army in Sweden. [2]
2017-09 · Test
First Sea Ceptor firing
Fired from HMS Argyll. [3]
Videos
Videos load from YouTube only when you press play. Official channels are marked.
Land Ceptor in action: UK’s deadly accurate missile system takes flight
BFBS Forces News · 2025-08-22
BFBS report on the first test-firing of Land Ceptor (Sky Sabre) in the UK.
Watch on YouTubeCapabilities and limitations
Stated capabilities
- Soft vertical launch with 360° coverage (manufacturer).
- Up to eight simultaneous threats; deployable in under 20 minutes (government).
- Active radar terminal homing with mid-course updates (reference work).
Limitations and open questions
- Expensive relative to the small drones it may face.
- Neither MBDA nor the MoD page gives a range figure; the 25 km figure comes from the reference work.
Relevance to threats
Listed by the strength of the evidence. Inclusion here is not a claim of proven effectiveness.
- Cruise missilesSecondary reference
Reference work and MoD describe cruise missiles and air-launched munitions among targets.
Sources
- 1.
MBDA · Manufacturer · Retrieved
Supports: Mass 99 kg, length 3.2 m, diameter 166 mm, soft vertical launch, 360° coverage, land/sea/air use
- 2.
UK Defence Equipment & Support · Government · Published · Retrieved
Supports: First full-system firing in Sweden; three times Rapier's range; up to eight simultaneous threats; ready in under 20 minutes; Sky Sabre with Giraffe radar
- 3.
CAMM (missile family) (opens in a new tab)
Wikipedia · Reference work (secondary) · Retrieved
Supports: CAMM range over 25 km, altitude 10 km, Mach 3, inertial mid-course with update and active radar terminal homing
- 4.
£4 billion UK-Poland air defence deal strengthens European security (opens in a new tab)
UK Ministry of Defence (GOV.UK) · Government · Published · Retrieved
Supports: MBDA–PGZ Narew sub-contract over £4 billion: more than 1,000 CAMM-ER and over 100 iLaunchers; range over 40 km; earlier £1.9 billion CAMM contract; IBCS and Polish radars
- 5.
UK jobs and air defences boost with purchase of new missile launchers (opens in a new tab)
UK Ministry of Defence (GOV.UK) · Government · Published · Retrieved
Supports: £118 million three-year contract with MBDA for six Land Ceptor launchers; doubles deployable Sky Sabre systems; controls 24 missiles simultaneously; Bolton site
- 6.
MBDA, Poland's PGZ to develop medium-range air defense missile (opens in a new tab)
Defense News · Specialist press · Published · Retrieved
Supports: Letter of intent for CAMM-MR, a medium-range interceptor based on CAMM for land systems and Miecznik frigates; Narew contract of 5 September 2023 for over 1,000 CAMM-ER and 138 launchers
- 7.
UK Government (GOV.UK) · Government · Published · Retrieved
Supports: GBP 1.9 billion export agreement completed by MBDA with the Polish government on Friday 28 April 2023 to equip 22 Polish air defence batteries (PILICA+) with CAMM missiles and launchers
- 8.
New Sea Ceptor missiles to be developed for Royal Navy (opens in a new tab)
UK Ministry of Defence (GOV.UK) · Government · Published · Retrieved
Supports: GBP 483 million demonstration contract with MBDA (UK) to develop Sea Ceptor, expected to last five years
- 9.
Saab · Manufacturer · Published · Retrieved
Supports: FMV contract to Saab, about SEK 1.6 billion, to install and integrate Sea Ceptor on the Visby-class corvettes; FMV had previously ordered Sea Ceptor from MBDA (date not given)
This record is compiled and kept up to date by World of Interceptors at www.worldofinterceptors.com/systems/camm. Cite it with a link to this page. Compiled from open sources and cross-checked, but accuracy cannot be guaranteed; manufacturers and independent organisations can ask us to correct or remove information (disclaimer).
Related systems
Revision history
· Created
Record compiled from public sources found through treg web search.
· Update
Added profile, land and naval integrations, operators, UK and Polish contracts, production plan, CAMM-ER/CAMM-MR milestones and a video from public sources.
· Update
Contracts audit: added the May 2025 Saab contract to fit Sea Ceptor to the Visby-class corvettes; Pilica+ and Sea Ceptor lines dated from GOV.UK.
Newsletter · every two weeks
The Interceptors Brief
What changed in air defence and counter-drone, in five minutes, with the sources attached.
Confirm by email · unsubscribe in one click · Privacy


